Primer coat is drying then a textured paint that reminds me of pool coping will be applied. The top will be covered with a good indoor/outdoor carpet of some sort and the board will be set up 7.5" trucks and ABEC 11 No Skoolz 65mm 81a.
The longview.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment